Texas Department of Licensing and Regulation (TDLR) administers electrician licensing in Texas. Every figure below is verified against the board’s own official pages and dated. Who must personally hold a credential — the contractor, the business, or the individual worker — is set out under Requirements.
What it’s called
Texas licenses individual electricians — the state electrician license is issued by the Texas Department of Licensing and Regulation and held by the electrician personally (not only by the contractor, as in some states). “Electrician license,” “journeyman electrician license,” “master electrician license” and “electrician certification” are common informal names for the individual credential. The exact license tiers, fees, and any separate electrical-contractor license are set out in the license types and requirements below.
License types & fees
| Type | Experience | Exam | Fee |
|---|---|---|---|
| Journeyman Electrician | 8,000 hrs OJT (may test at 7,000) under a licensed TX master electrician | PSI, 70% to pass | $30 |
| Master Electrician | Must have held a Texas Journeyman Electrician license for at least two years, plus 12,000 hrs OJT under a licensed TX master electrician (both conditions) | PSI, 70% to pass | $45 |
Who does NOT need this license — exemptions
Texas exempts a long list of persons and work from the Electricians licensing law (Texas Occupations Code ch. 1305), which governs the Journeyman and Master Electrician licenses this page covers. Under Tex. Occ. Code sec. 1305.003(a), the chapter does not apply to: work on a dwelling performed by a person who owns and resides in that dwelling, so long as the work is ’not specifically regulated by a municipal ordinance’ (sec. 1305.003(a)(6)) — a city may still require permits or licensing; in-house maintenance electricians — electrical work performed by a person who does not engage in electrical work for the public, is regularly employed as a maintenance person or maintenance electrician for a business, and is not installing electrical equipment during new construction (sec. 1305.003(a)(8)); electrical equipment under the exclusive control of an electric utility, power generation company, electric cooperative, or municipally owned utility, in specified utility locations (sec. 1305.003(a)(5)), and similar gas-utility equipment (a)(9)); communications equipment provided by a telecommunications provider (a)(4)) and cable-operator equipment and network facilities (a)(16)); railway power/signaling installations (a)(3)) and electrical equipment in ships, non-floating-building watercraft, railway rolling stock, aircraft, motor vehicles, and recreational vehicles (a)(1)); underground mine and mobile surface-mining machinery installations (a)(2)); thoroughfare lighting, traffic signals, intelligent transportation systems, and telecommunications controlled by a governmental entity (a)(10)); HVAC electrical connections — connections supplying heating, ventilation, cooling and refrigeration equipment, including the required disconnect, when performed by an air conditioning and refrigeration contractor licensed under ch. 1302 (a)(11)); Class 1, 2, or 3 remote-control, signaling, or power-limited circuits, fire alarm circuits, optical fiber, and communications circuits as defined by the National Electrical Code (a)(12)); landscape irrigation control systems and landscapers’ low-voltage exterior and holiday lighting, excluding the power source (a)(13)); in-plant industrial work — electrical work at a chemical plant, petrochemical plant, refinery, natural gas plant or treating plant, pipeline, or oil and gas exploration and production operation by that business’s own employees, and certain long-term (12-month-plus) contract electrical workers at such plants outside new construction (a)(14)); agriculture — electrical work on a building, structure, or equipment in agricultural use (other than processing an agricultural commodity) (a)(18)); electrical equipment manufacturers’ authorized employees/representatives doing manufacturing, commissioning, testing, retrofit-with-same-ampacity, and in-enclosure servicing of their own products (a)(7)); elevator and escalator work regulated under Health and Safety Code ch. 754, excluding the power source (a)(15)); on-site sewage disposal system work (a)(17)); well pump and equipment work under ch. 1902 (a)(19)); electrical work in the factory construction and assembly of HUD-code manufactured or modular housing by licensed manufacturers/installers, other than service entrance conductors (a)(20)); licensed plumbers installing or servicing plumbing fixtures and appliances (water heaters, disposals, dishwashers, etc.) on existing electrical circuits only (a)(21)); residential appliance maintenance or repair by an appliance dealer or manufacturer using components of the same type and ampacity (a)(22)); and municipal employees maintaining pool-related electrical devices on municipally owned or operated pools (a)(23)). Political subdivisions (school districts, municipalities) do not need an electrical contractor license to employ electrical workers — but their individual employees still must hold the appropriate individual license (sec. 1305.003(d)-(e)). TDLR’s own exemptions page restates these plainly, e.g. that a maintenance electrician ‘who does not engage in electrical work for the public and does not install electrical equipment in new construction is not required by the state to be licensed as an electrician.’
Fees
Application (non-refundable): $30 journeyman, $45 master. Exam fees per the PSI Candidate Information Bulletin.
Exam
The edition the exam references is stated four times by TDLR and PSI, and as of September 22, 2026 all four agree on the 2026 NEC. 16 TAC §73.100 adopts the 2026 NEC as the state’s electrical code effective September 1, 2026 (Texas Register, August 28, 2026 adopted rules, TRD-202603409). The cover of the PSI Electrician Candidate Information Bulletin — the document TDLR’s own exam page designates as the authority on the examination — states in capitals: “EFFECTIVE SEPTEMBER 1, 2026, THE EXAMINATIONS WILL BE REFERENCED TO THE 2026 NEC.” The bulletin’s Reference Materials list (bulletin updated 9/15/2026) now names “National Electrical Code®, 2026 Edition”, and TDLR’s Electrician Exam Information page states “You will be allowed to reference the National Electrical Code®, 2026 Edition”. Until mid-September 2026 both of those still named the 2023 Edition. The bulletin also states the operative rule: “Any soft-bound edition of the National Electrical Code® may be used for the examination. (Examination questions are based on the current TDLR-adopted bound edition.)” — and the current TDLR-adopted edition has been the 2026 NEC since September 1, 2026. TDLR does not allow loose-leaf, spiral-bound or ring-bound copies. Current as of September 22, 2026.
Renewal & continuing education
Annual (license valid one year from issuance; renew online) 4 hours of continuing education per renewal; the 4 hours must cover the National Electrical Code (Tex. Occ. Code ch. 1305). TDLR states the required coursework must address the National Electrical Code as adopted under Tex. Occ. Code §1305.101, or the current NEC as approved by the NFPA, together with Texas electrician law (Tex. Occ. Code ch. 1305) and the Texas electrician administrative rules (16 TAC ch. 73). The edition adopted under §1305.101 is the 2026 NEC, effective September 1, 2026 (16 TAC §73.100).
How to apply
Applications are handled by Texas Department of Licensing and Regulation (TDLR). Start at the official application page .
Verify a license in Texas
Texas Department of Licensing and Regulation (TDLR) publishes a public license search , searchable by license type, license number, name or business name, city, county or zip code. It covers TDLR-issued individual and business licenses, including electrician licenses and air conditioning/refrigeration contractor and A/C technician licenses; active licenses only.
Results come from the operator’s own system, through the search above. LicensingAtlas does not hold license records and cannot confirm any individual’s status — the date on this page refers to the requirements described above, not to anyone’s credential.